Huadong Boiler has been utilizing a formal quality management system since its establishment. We conduct strict quality inspection for every production stage from raw materials procurement to finished product delivery. All operations are tracked in real time and traceable. We attach great importance to even the smallest details of production. We carefully inspect the quality of metal materials, welding procedures, assembly streee tests, spraying, and packaging. We also ensure high quality training for our technical operators.
- Steel material
- X-ray detection
- Ultrasonic detection
- Magnetic particle detection
- Steel tube seam height testing
- Water pressure detection
- Steel tube hardness detection
- Weld inspection
The following are the basic elements covered by the written quality document:
- Management responsibility
- Quality System
- Contract Review
- Design Control
- Document Control
- Purchasing
- Purchaser Supplied Product
- Product Identification and Traceability
- Process Control
- Inspection and Testing
- Inspection and Test Status
- Control of Nonconforming Product
- Corrective Action
- Handling, Storage, Packaging and Transportation
- Quality Records
- Internal Quality Audits
- Training
- Servicing
- Statistical Techniques
- Inspection/Measuring and Equipment Test
- Proportion of raw materials incoming inspection: 100%
- Proportion of processing product inspection: 100%
- Proportion of finished product inspection: 100%
- Inspection procedures or documents are visible to all operation workers.
- Supervision and audit from users are accepted.
Quality Assurance
- Chemical analysis
- Direct reading spectrometer
- Tensile test
- Metallurgical microscope
- Spectrograph
- Microscope
After sales service
If a customer has any problem regarding installation or usage after delivery, we will contact you via email within 24 hours after being informed.
We can assign two engineers to direct the installation (depend on the project and personnel conditions)