This client in Pakistan purchased some of our industrial boiler components for the construction of their steam boiler which will be applied in their sugar refinery. The components included a steam drum, boiler economizer, boiler fine tube. All of these products are designed and produced in accordance with ASMEI 2017 standards and amount to a total manufacturing tonnage of 318 tons.
This US client specializes in the conversion of waste energy to green energy. In order to improve the cycle’s thermal efficiency of the steam powered equipment, customers purchased our boiler superheaters. They designated 310H stainless steel as the raw material, and strictly checked our welding standards and spraying process. The entire process was carried out in accordance with ASME standards. The assembly and delivery of the finished products was also conducted according to customer requirements.
Year: 2017
Region and client: A Taiwan’ chemical plant
Project: Low Temperature Boiler Manifold *2, used for the heat recovery at the back pass of the steam
boiler in this chemical factory
Material: ND Steel
Weight: 276 ton
Year: 2017
Region and client: A Taiwan’ chemical plant
Project: Low Temperature Boiler Manifold *2, used for the heat recovery at the back pass of the steam
boiler in this chemical factory
Material: ND Steel
Weight: 276 ton
Client | Country | Product | Weight (tons) |
M&J Fabrication & Installation, Inc. | Thailand | Drum & Water Wall & Economizer & Superheater & Header (2 sets) | 742.66 |
COVANTA Energy, KENET FACTORY | USA | Kent Unit 2 Econ Bundle 2 | 11.95 |
COVANTA Energy, KENET FACTORY | USA | Kent Unit 1 Intermediate Superheater | 7.23 |
COVANTA Energy, MONTGOMERY FACTORY | USA | Montgomery Unit 3 Intermediate Superheater | 20.29 |
COVANTA Energy, YORK FACTORY | USA | York PSH U1/U3 | 10.98 |
COVANTA Energy, YORK FACTORY | USA | York PSH U1/U3 | 24.73 |
COVANTA Energy, YORK FACTORY | USA | York PSH U1/U3 | 17.6 |
Wheelabrator Environmental Systems INC | USA | North Andover SH | 32.38 |
COVANTA Energy, LONG BEACH FACTORY | USA | Long Beach Unit 2 Econ | 23.4 |
COVANTA Energy, PASCO FACTORY | USA | PASCO PSH 2 Unit 2 | 13.137 |
M&J Fabrication & Installation, Inc. | Thailand | Steam Header | 5.421 |
Wheelabrator Environmental Systems INC | USA | North Andover ISH | 25 |
COVANTA Energy, CAMDEN FACTORY | USA | CAMDEN PSH SSH UNIT A C(UNIT A) OVERLAY | 54.72 |
COVANTA Energy, PASCO FACTORY | USA | Pasco Economizer 2 Unit 1 | 18.2 |
THERMAL ENERGY SYSTEMS (PTY) LTD | SOUTH AFRICA | Economizer | 18.85 |
Client | Product | Model | Weight (tons) |
Feicheng Changsheng | Evaporator, Economizer, Superheater, Superheater Fixed Unit | 20t/h HRSG Boiler | 49.91 |
Qingdao Mai Jie Heating Power Co. | 20t/h Steam Boiler (Complete) (Stream Drum, Q245R, δ16) | 21t/h Steam Boiler | 120 |
Zhangjiagang Special Glass Co. | Evaporator, Economizer, Superheater | 25t/h HRSG Boiler | 129.994 |
Kuitun Jing Jiang Chemical Engineering Co. | Water Wall Panel | 3×165t/h Industrial Boiler | 99.496 |
Coast Defence4# | Low Temperate Superheater | 300MW Power Plant Boiler | 534.766 |
Suancigou1# | Spiral Economizer | 300MW Power Plant Boiler | 780.046 |
Gansu Qilian Mountain | Evaporator, Economizer, Superheater | 4.5MW HRSG Boiler | 128.14 |
Qingdao Mai Jie Heating Power Co. | 40t/h Hot Water Boiler (Complete) (Boiler Stream Drum, Q245R, δ18) | 41t/h Hot Water Boiler | 200 |
Wulan, Inner Mongolia | Evaporator, Economizer, Superheater | 4MW HRSG Boiler | 106.648 |
Xinpeng, Yantai | 59MW Corner Tube Hot Water Boiler (Complete) (Stream Drum, Q245R, δ18) | 59MW Hot Water Boiler | 395 |
Zhanjiang4# | Low Temperate Superheater | 600MW Power Plant Boiler | 1041.031 |
Weishui1# | Low Temperate Reheater | 600MW Power Plant Boiler | 735 |
Ji'an, Jiangxi# | Water Wall Panel | 65t/h Biomass Boiler | 101.723 |
Baicheng2# | Water Wall Panel | 660MW Power Plant Boiler | 93.461 |
Hebei Yingxin Glass Group | Evaporator, Economizer, Superheater | 6MW HRSG Boiler | 125.381 |
Shijiazhuang Yushgi Glass Co. | Evaporator, Economizer, Superheater | 7.5MW HRSG Boiler | 208.896 |
Yantai Heating Power Co. | 70MW Hot Water Boiler (Complete) (Steam Drum Q245R, δ18) | 70MW Hot Water Boiler | 390 |
Tianfu, Sinkiang | Water Wall Panel & Fixed Unit | 75t/h Industrial Boiler | 72.855 |
Zhangzhou | Steam Air Preheater | 75T/H Steam Boiler DHL75-2.5-AII | 73 |
Jinlin River, Baoji | Evaporator, Economizer, Superheater | 8MW HRSG Boiler | 288.784 |
Juxian | Evaporator, Economizer, Superheater | 9MW HRSG Boiler | 256.324 |